AC-1 AC1 FT-10 HMI Case Keypad Membrane Film Repair
- Model
- AC-1 AC1 FT-10
Item specifics
- Brand
- Schneider
- Warranty
- 365 Days
- Supply
- Andover Controls Plastic Housing
- Supply
- Andover Controls Protective Film Keypad
- Model
- AC-1 AC1 FT-10
Review
Description
Schneider Andover Continuum AC-1 AC1 FT-10 Plastic Shell Keyboard Membrane Front Overlay Repair Kit

VICPAS offers high-quality replacement parts for Schneider Andover Controls AC-1 Series and AC-1 FT-10 enclosures, including keypad panels, protective membranes, and plastic casings, ensuring efficient repair and maintenance solutions. These components are designed to restore full functionality to your AC-1 AC1 FT-10 systems, minimizing downtime and ensuring smooth operation.
Each replacement part is engineered for precise compatibility with Schneider Andover Controls AC-1 Series, providing a seamless fit without requiring additional modifications. The keypad panels, protective membranes, and enclosures undergo rigorous quality control, ensuring durability, easy integration, and stable performance.
With VICPAS, you get reliable, cost-effective solutions that extend the lifespan of your Schneider Andover Controls AC-1 systems, reducing maintenance costs and avoiding costly system disruptions. Invest in VICPAS to keep your industrial systems running efficiently and smoothly.
Specifications:
The table below describes the parameters of the Andover Continuum AC-1 AC1 FT-10 Plastic Case Terminal Keypad Protective Film HMI Parts.
Brand: | Schneider |
IP Degree of Protection: | IP20 |
Operating Temp.: | -10 °C to 50 °C |
Storage Temp.: | -25 °C to 70 °C |
Series: | AC-1/td> |
Power Requirements: | 24V DC |
Operating Position: | Vertical |
Warranty: | 12 months |
Related Schneider Andover Continuum Part No. :
Schneider Andover Continuum | Description | Inventory status |
Schneider Andover Controls | Description | Inventory status |
Schneider Andover Continuum HMI Manuals PDF Download:
FAQ:
Question: How to replacing oradding I/O Modules?
Answer: There are two ways to replace an I/O module to minimize the potential for long-term harm to any equipment. The procedure that you follow depends upon the exact installation and the circumstances that exist at the time of replacement. Both procedures are described below. In either case, the controlled equipment must be overridden during the process. If no external method of override exists, the equipment will go off.
Remove all power from the NetController and I/O modules:
1. Turn power supply off.
2. Disconnect the batteries.
3. Replace or add the I/O module.
4. Turn power supply on.
5. Reconnect batteries.
6. Reload NetController
Remove power to the I/O bus only:
1. Ensure that batteries are connected and fully charged.
2. Turn power supply off.
3. On the CyberStation workstation or Command Terminal Interface, cd to the appropriate controller in the command line: type “set IOUPower = off”. The battery will now only power the CPU and modem (if applicable).
4. Replace or add the I/O module.
5. Restore power.
6. If the NetController version is prior to 1.03, type “set IOUPower = on” in the command line in CyberStation or Command Terminal Interface.
Question: How long does it take to receive the Andover Continuum AC-1 AC1 FT-10 HMI Case Switch Membrane Front Overlay after placing an order?
Answer: Standard delivery typically takes 2-4 business days, depending on your location and the selected shipping method. Expedited options may be available upon request.
Question: Do the Andover Continuum AC-1 AC1 FT-10 replacement Plastic Cover control keypad Protective Film come with a warranty?
Answer: Yes, VICPAS provides a warranty for all replacement parts. If you encounter any issues, please get in touch with our support team for assistance.
Common misspellings:
AC--1 AC1 FT-10AC-1 AC1 FT-0
AO-1 AC1 FT-10
AC-1 ACI FT-10
AC-1 AC1 TF-10